Project Experience

A selection of projects company director Saud Alobaidy was involved in
Waikeria Prison Development
PPP Project | Budget $750M
ROLE: SENIOR PROJECT ENGINEER

Scope of works:

The Waikeria Corrections and Treatment Facility will deliver accommodation for 500 prisoners, along with a world-class secure mental health unit providing care for additional prisoners; CPB Contractors will design and construct the new facility

SH1/Tarewa Interchange Section Improvement
NZTA | Budget $13M
ROLE: SENIOR ENGINEER

Scope of works:

The SH1/Tarewa Road intersection upgrade improves traffic flow and safety. It also improves safety for those walking and cycling with a shared path under the new bridge and signalised pedestrian crossings providing important links to Whangārei Hospital, Northland Polytech and the CBD.

Abu Dhabi Airport Interchange and Airport Region Road Network
Abu Dhabi General Services Company PJSC (Musanada) / Department of Transport (DOT), | Budget $330M
ROLE: CONSTRUCTION MANAGER

Scope of works: This new road network connects the new airport terminal (being built simultaneously) to the Abu Dhabi-Shahama (E10) highway. It provides direct access to and from the terminal towards Abu Dhabi, Dubai, and Al Ain. The E10 was widened from four to five lanes in both directions for 8 km. The scope included the construction of the Airport interchange through four bridges (totalling 4.8 km), an underpass and overpass, a stormwater pump station and drainage works, lighting, and traffic lights. The structures are 49 spans cast-in situ post-tensioned box girder and a three-span bridge pre-tensioned I beam girder.

Improvement of the 5th Industrial Intersection Sharjah (Emirates Road) Sheikh Khalifa Interchange & Al Dhaid Interchange
Ministry of Public Works | Budget $280M
ROLE: PROJECT ENGINEER

Scope of works:

A project to improve the Emirates Road corridor at the 5th industrial junction and meet expected traffic demand. The scope of works included constructing two interchange bridges (78-span cast-in situ post-tensioned box girder bridge) and four underpasses.

Improvement of Al Khail Road
Budget $135M
ROLE: PROJECT ENGINEER

Scope of works:

27 spans cast-in situ post-tensioned box Girder Bridge

Dubai Industrial City
Budget $145M
ROLE: PROJECT ENGINEER

Scope of works:

Infrastructure Project (Roads and Services)

We're ready to work with you

Tell us about your project and we will offer a tailored solution that suits your needs. 

CONTACT US